Street Closure

This Saturday, 109 Street (north) will be closed (in front of our building, between Jasper & 102 Ave) between 9am-1pm. This closure is to allow for the construction materials required for the pool project to be lifted to the project area.

Pedestrian traffic will be re-routed to a covered walkway (next to the building) at this time. Proceed with caution.

Comments

Projected time

What is the projected time for the pool to be opened again?

Pool

The pool will never be re-opened again. The area is being converted into a recreation room. The project, if everything stays on schedule, will be complete sometime in April (but that doesn't include furnishing or renovations, so more likely June).

The post about the pool being decommissioned (one below this one) describes it a bit more.

Pool

Thank you Cap Chris for the reply.